Size: Phase 1: Stacks 1 and 2; Phase 2: Stacks 6 and 7; Phase 3: Stacks 3, 4, 5, and Community Building
Date Completed: 2017
Birnam Wood Moisture Mitigation – Phases 1, 2 & 3
Our team provided below-grade waterproofing replacement design along the exterior walls at Stacks 1-7 and the Community Building. Scope included, but was not limited to:
shoring for the rockery adjacent the building,
excavation of existing soil down to the footing (in some locations 12’-0”)
removal of existing dampproofing,
installation of a new bituminous waterproofing system, and