Pier 69 Roof Replacement
Pier 69 Roof Replacement
Pier 69 Roof Replacement

Pier 69 Roof Replacement

CAG’s team was commissioned to provide roof replacement design for the headquarters of the Port of Seattle. The roof system was based on a three-ply modified bitumen roof with a granulated cap-sheet over concrete and metal deck substrates—and designed and detailed to last a minimum of 25 years. Included in the project scope was the replacement of 8 saw-tooth gutters with PMMA liquid-applied roofing.