Sea-Tac International Airport Concourse B Roof Overlay

LOCATION

Sea - Tac

YEAR COMPLETED

2018

CONSTRUCTION VALUE

ARCHITECT

PROJECT OVERVIEW

Our team provided a report of preliminary investigation that included multiple roof cuts to verify the existing roof system and mitigate change conditions during construction. For this continuously operating facility a roof overlay was determined to be a prudent and cost-effective solution—including a roof coverboard and an 80 mil heavy-duty membrane with an expected life of 30 years. Additionally, CAG designed replacement of 20,000 sf of translucent skylights and windows to upgrade light transmission into the concourse area.

BUILDING ENVELOPE CONSULTANT

Andre Coppin

BUILD TEAM